We make process systems for the industries listed below, as well as for other applications:
| |
|
Construction of a new steam boiler for the hygienic tissue paper plant Delitissue in Ciechanów with LOOS boiler of the capacity of 16 tonnes of steam per hour. On the mezzanine one can see two permeating water tanks. Below: components of the water treatment station equipped with a reversed osmosis unit. |
|
| |
|
|
| |
|
Construction of cooling water systems and compressed air pipelines for the hydraulic and mechanical presses in the automotive body panel stamping press Gestamp Spółka z o.o. in Września. |
|
| |
|
|
| |
|
Our company carries out all the works by own forces in the field of broadly understood process installations. The picture shows one of our employees working on a component of the hot water installation in the heat generating plant of the Szczecin Heat Generating Company (SEC). Modernisation of an old, coal-fuelled heat generating plant to operate on oil and gas with two LOOS boilers of the capacity of 32 MW each. |
|
| |
|
|
| |
|
Steel mezzanine platform accommodating the condenser for cooling units in the brewery of Kompania Piwowarska S.A. in Poznań. |
|
| |
|
|
| |
|
Boiler water treatment module by LOOS complete with automatic dispenser for chemical agents. Installed in the Dairy Products Co-operative Poznań Dębiec. |
|
| |
|
|
| |
|
It the background one can see two membrane-type expansion vessels installed for the needs of combined radiant and water heaters in the production halls of the automotive panel stamping press - Gestamp Polska Spółka z o.o. in Września. |
|
| |
|
|
| |
|
On the wall of the production hall one can see pipe systems: radiant heaters supply (heaters are suspended on the 13th meter of the hall - supply risers visible), central heating for offices, domestic hot water, cold water, supply of fan coil heaters and heaters in the hall and in offices. Site: automotive panel stamping press - Gestamp Polska Spółka z o.o. in Września. |
|
| |
|
|
| |
|
The executed cooling water system and compressed air pipelines for hydraulic and mechanical presses located above the ducts in automotive panel stamping press - Gestamp Polska Spółka z o.o. in Września.
|
|
| |
|
|
| |
|
The executed cooling water system and compressed air pipelines for hydraulic and mechanical presses located above the ducts in automotive panel stamping press - Gestamp Polska Spółka z o.o. in Września. |
|
| |
|
|
| |
|
One of the three stages of heating of process water in a newly built meat processing plant BARTEK in Kłosowice. |
|
| |
|
|
| |
|
Water boiler with the LOOS boiler of the output of 1150 kW + separate summer operation system. On the left - water collector used for radiant heating of the production halls. In the background a Brotje water boiler of the output of 54 kW (summer) - automotive panel stamping press Gestamp Polska Spółka z o.o. in Września.
|
|
| |
|
|
| |
|
Water boiler house with a LOOS boiler of the output of 1150 kW + separate summer operation system 54 kW. On the left: a water collector used for heating of offices and personnel facilities. In the background: membrane expansion vessels and single-cylinder ionite water treatment station with chemical correction - automotive panel sheet cutting plant Gonvarri Polska Spółka z o.o. in Września. |
|
| |
|
|
| |
|
Part of a central heating system in the automotive panel sheet cutting plant GONVARRI Polska Sp. z o.o. in Września |
|
| |
|
|
|
|
|
On the wall of the hall one can see pipe systems supplying radiant heaters (risers visible approx. every 24 m), raw water supply to water treatment station for the needs of a cooling system for hydraulic and mechanical presses, built by us, as well as compressed air pipelines and supply to heaters installed in the hall. Automotive panel stamping press - Gestamp Polska Spółka z o.o. in Września. |
|
| |
|
|
| |
|
Water heating installation supplying personnel facilities (JAD exchanger) and a set of steam and water collectors. District Dairy Products Co-operative Poznań Dębiec |
|
| |
|
|
| |
|
Nearly 150 m long runs of radiant heaters operating on 120°C water heating agent are visible under the ceiling of the production hall - the only heaters in Poland installed at such height (19 meters). This technology of heating of the halls enabled the investor to save a lot of space alongside the walls and limited the circulation of air in the facility, which prevented the settlement of dust and helped to maintain the required cleanness. On the right hand side industrial [transfer] pipe installations visible. Automotive panel stamping press - Gestamp Polska Spółka z o.o. in Września. |
|
| |
|
|
| |
|
Nearly 150 m long runs of radiant heaters operating on 120°C water heating agent are visible under the ceiling of the production hall - the only heaters in Poland installed at such height (19 meters). This technology of heating of the halls enabled the investor to save a lot of space alongside the walls and limited the circulation of air in the facility, which prevented the settlement of dust and helped to maintain the required cleanness. On the right hand side industrial [transfer] pipe installations visible. Automotive panel stamping press - Gestamp Polska Spółka z o.o. in Września. |
|
| |
|
|
| |
|
Kampmann heater in the automotive panel stamping press - Gestamp Polska Spółka z o.o. in Września |
|
| |
|
|
| |
|
Runs of radiant heaters operating on 120°C water heating agent are visible under the ceiling of the production hall. This technology of heating of the halls enabled the investor to save a lot of space alongside the walls and limited the circulation of air in the facility, which prevented the settlement of dust and helped to maintain the required cleanness. On the right hand side one can see industrial [transfer] pipe installations. Automotive panel stamping press - Gestamp Polska Spółka z o.o. in Września. |
|
| |
|
|
| |
|
Runs of radiant heaters operating on 120°C water heating agent are visible under the ceiling of the production hall. This technology of heating of the halls enabled the investor to save a lot of space alongside the walls and limited the circulation of air in the facility, which prevented the settlement of dust and helped to maintain the required cleanness. On the right hand side one can see industrial [transfer] pipe installations. Automotive panel stamping press - Gestamp Polska Spółka z o.o. in Września. |
|
| |
|
|
| |
|
Nearly 150 m long runs of radiant heaters operating on 120°C water heating agent are visible under the ceiling of the production hall - the only heaters in Poland installed at such height (19 meters). This technology of heating of the halls enabled the investor to save a lot of space alongside the walls and limited the circulation of air in the facility, which prevented the settlement of dust and helped to maintain the required cleanness. On the right hand side industrial [transfer] pipe installations visible. Automotive panel stamping press - Gestamp Polska Spółka z o.o. in Września. |
|
| |
|
|
| |
|
Degassing tank for the 16 t of steam/h boiler complete with degassing column and associated boiler house process installations. Hygienic tissue paper production plant DELITISSUE in Ciechanów. |
|
| |
|
|
| |
|
A hall housing ammonia compressors. |
|
| |
|
|
| |
|
Wood processing plant Kronospan PL Sp. z o. o. Szczecinek. |
|
| |
|
|
| |
|
Supply of two fuel economisers from LOOS adapted by us for Sefako boilers of the output of 8 tonnes of steam per hour each. Guaranteed return on investment within less than 3 years of operation with a total cost of approx. 500 thousand PLN. |
|
| |
|
|
| |
|
A part of the heat generation hall of the Heat Generating Company SEC in Szczecin |
|
| |
|
|
| |
|
A part of boiler installation in the heat generating plant of the Heat Generating Company SEC in Szczecin. |
|
| |
|
|
| |
|
Control cabinets for the LOOS boilers - execution from scratch by the electrical, automatic control and visualisation department of ENERGO-SPAW. Modernisation of an old heat generating plant operating on coal to operate on gas and oil with two LOOS boilers of the output of 32 MW each at the heat generating plant of the Szczecin Heat Generating Company (SEC). |
|
| |
|
|
| |
|
Two fuel economisers from LOOS of the capacity of 350 kW each installed by ENERGO-SPAW on Sefako boilers generating 8 tonnes of steam/h in the Maltadecor S.A paper mill in Poznań. Guaranteed return on investment within less than 3 years of operation with a total cost of over 500 thousand PLN. |
|